Mapping smart meters, solar inverters & VFDs to IEC 104
Using built-in device templates and structured IOA blocks for Eastron SDM630, Schneider PM5xxx, SunSpec, SMA, Growatt and ABB drives
Quick answer: Max IEC Gateway 1.3.0 includes 9 built-in device templates (Eastron SDM120/SDM630, Schneider PM5xxx/Altivar, Carlo Gavazzi EM24, SMA, SunSpec, Growatt, ABB ACS580) and validated CSV import/export to map float measurements (M_ME_NC_1), kWh energy counters (M_IT_NA_1) and curtailment setpoints (C_SE_NC_1) in minutes.
Pre-Built Modbus-to-IEC 104 Device Templates in Max IEC Gateway v1.2
Instead of typing dozens of register addresses by hand, Max IEC Gateway 1.3.0 includes 9 ready-to-use industrial device templates plus CSV bulk import/export. Below is how common smart meters, solar inverters, and VFDs map from Modbus into IEC 60870-5-104:
| Template / Equipment | Modbus Function & Data Types | Mapped IEC 104 Type IDs | Typical Parameters Included |
|---|---|---|---|
| Eastron SDM630 / SDM120 | FC04 Input Regs · FLOAT32 (ABCD) | M_ME_NC_1 (13) / M_ME_TF_1 (36) + M_IT_NA_1 (15) | Phase L1/L2/L3 voltages, currents, active/reactive power, PF, frequency & kWh import/export counters. |
| Schneider PowerLogic PM5xxx | FC03 Holding Regs · FLOAT32 (ABCD) & INT64 | M_ME_NC_1 (13) & M_IT_TB_1 (37) | 3-phase RMS currents, L-L/L-N voltages, total kW/kVAR/kVA, frequency & accumulated energy. |
| Carlo Gavazzi EM24 | FC04 / FC03 · INT32 (CDAB) scaled | M_ME_NC_1 (13) & M_IT_NA_1 (15) | Grid voltages, phase currents, active power (W), and total kWh counters. |
| SMA / SunSpec Solar Inverters | FC03 · INT16/UINT16/INT32 + scale | M_ME_NC_1 (13), M_SP_NA_1 (1), C_SE_NC_1 (50) | AC output power, DC string voltage/current, grid frequency, operating state, and active power curtailment setpoint. |
| Growatt PV Inverters | FC04 Input & FC03 Holding · UINT16/UINT32 | M_ME_NC_1 (13), M_IT_NA_1 (15), C_SC_NA_1 (45) | PV1/PV2 input voltage/power, grid AC output, daily/total kWh yield, and remote ON/OFF control. |
| Schneider Altivar & ABB ACS580 VFDs | FC03 / FC06 · UINT16 & INT16 bitfields | M_SP_NA_1 (1), M_ME_NB_1 (11), C_SC_NA_1 (45), C_SE_NB_1 (49) | Drive status word bits (Ready, Running, Fault), output frequency/current/torque, Start/Stop command & speed reference. |
Recommended IOA Range Planning for Multi-Device Substations & PV Plants
When a single Max IEC Gateway polls 10–50 field devices and presents them under a single Common Address (e.g. CA = 1), assign structured Information Object Address (IOA) blocks so SCADA engineers can identify every point immediately:
- Device 1 (Grid Meter SDM630): Statuses
IOA 1001–1099· Analog FloatsIOA 1101–1199· Energy CountersIOA 1201–1220· CommandsIOA 1301–1320 - Device 2 (Inverter #1): Statuses
IOA 2001–2099· Analog FloatsIOA 2101–2199· Energy CountersIOA 2201–2220· SetpointsIOA 2301–2320 - Device N: Base
IOA = N × 1000. Export your first device to CSV, increment the IOA column in Excel, and import all devices in seconds with Max IEC Gateway's validated CSV importer!
Frequently asked questions
Can I import and export point mappings in Excel / CSV?
Yes. Max IEC Gateway 1.3.0 supports CSV export and validated all-or-nothing CSV import with a live preview before applying changes.
Can one gateway poll both Modbus TCP inverters and RS-485 serial meters at the same time?
Yes. You can configure multiple Modbus TCP connections, RS-485/RS-232 serial lines (with multiple RTU slave IDs per serial port), and RTU-over-TCP gateways simultaneously, and serve all of them to up to 10 IEC 104 SCADA masters.
Test IEC 104 commands & telemetry live with Max IEC Gateway
Download the free 30-day trial for Windows 10/11 or Linux x64 and inspect every Modbus poll and IEC 104 ASDU in the live web traffic monitor.
Download Free Trial All IEC 104 Guides